Quick detail:
Product Name |
High tensile strength hot dipped galvanized steel wire rope for hoist basket (nacelle machine) |
Construction |
4x31(ws)+PPC, 4x25(Fi)+PPC, 4x26(ws)+PPC, |
Diameter |
8.0mm-12.0mm |
Standard |
GB, DIN, EN, JIS, BS, ASTM |
Lay |
R.H.R.L/R.H.L.L /L.H.R.L/L.H.L.L |
Material |
Galvanized steel |
Core |
PPC |
Nominal T/S |
1960MPA-2160MPA |
Lubrication |
All Dry |
Application |
suspending cradles platform, electric nacelle machine, cleaning windows equipment etc. |
HS code |
731210000 |
Min Order |
5TONS/5000M |
Shipping port |
NANTONG PORT, QINGDAO PORT, SHANGHAI PORT |
Place of origin |
Jiangsu, China |
Packing |
In Ply-wooden reels or in soft coils, then in pallets |
Technical data:
Product description:
We can supply high tensile strength hot dipped galvanized steel wire rope for electric nacelle machine, hoist basket. The constructions are 4x31(ws)+PPC, 4x25(Fi)+PPC, 4x26(ws)+PPC, etc.. The main diameter is 8.3mm and 8.6mm. Also can produce different diameters and constructions according to customers’ requirement.
Product photo
Production process
Package and loading:
Soft Coil, Poly Bag, Woven Bag, Carton, Plastic reel, Wooden reel, Wooden Case, Wooden Pallet, etc. According to the customer's request and the length of the rope, we will choose the suitable packing for you.
Port: Any port in China. Usually in Nantong port or Shanghai port
How to order
Honor:
RFQ:
Q: How many tons or how many reels one 20’ container can load?
A:In general, a 20GP container can hold about 24 tons of goods (However, some destination ports have strict weight restrictions, depending on the specific port)
If the goods are in small packages then packed in pallets, the total number of pallets is about 20 or 24.
Q: How about your delivery time ?
A: Normally, we can finish the goods within 45-50days. However, when the temperature is high in summer, the delivery time will be a little longer. The most important factors are the quantity, the size and the order of the contract.
Q:What’s your payment term and trade term?
A: Payment term: 30% by T/T as the down payment, then 70% balance amount against the copy of B/L;100% L/C at sight;100% invoice amount by T/T before shipment, etc.
Trade term: CIF, FOB NANTONG or SHANGHAI, CFR, DDU, etc.
http://www.shenwei-steelwirerope.com/